Processors tend to recommend a much larger extruder than what’s really necessary for the job and the capabilities of the downstream equipment.

Share

Knowing that customer requirements change continuously and output improvements are always being pursued, operating people nowadays tend to recommend a much larger extruder than what’s really necessary for the job and the capabilities of the downstream equipment. While getting an oversized extruder provides “just-in-case” flexibility, it can also result in much higher daily operating costs. Let’s take a look at why.

Both AC and DC drives have a higher power usage per pound of output at low speeds. DC drives are even more expensive to operate than AC drives at low speeds because of their additional disadvantage of poor power factor at low speed. The larger extruder increases thermal losses to the environment because the latter are proportional to the heated surface area of the extruder. This can be useful in cold weather to heat the plant, but it is a major cost factor in warm weather, particularly if it requires use of air conditioning.

The electrical requirements for heat-up and temperature maintenance are also proportional to the extruder’s mass. Heat-up time can double from one extruder size to the next. Although not usually a major cost factor, larger extruders also require more floor space. More importantly, they also require larger-capacity utilities with higher expenses associated with installation and maintenance.

Another important cost factor is the extra time it takes to start up and change over a larger extruder. This extra time results in lost production and generation of larger amounts of scrap. Even routine changeovers requiring purging are more expensive, as much more purge material is required to change materials or colors.

Naturally the capital investment expense goes up with machine size, and that has to be amortized into the production cost. Moving up one extruder size roughly doubles the installed capital investment. At equivalent outputs, larger extruders have more residence time and have more material inside, increasing the likelihood of degradation as well as the amount of degraded polymer.

Simply put, extruder size needs to be considered in the daily economics of producing extruded products. For example, operating a 4.5-in. extruder at 1000 lb/hr and a 6-in. extruder at the same output can result in a 50-100% increase in total operating cost, depending on the particulars of the equipment, electrical cost, number of changeovers, and polymers being processed.

Deciding on the right extruder size is also important when deploying the extruders you already have in place. Many times, I have seen little or no thought going into the selection of the most economical extruder. Recently I  saw thin-gauge, narrow PET sheet being run on a 6-in., 34:1 extruder with a 500-hp drive. The screw speed was 36 rpm with a maximum of 125 rpm. Sitting nearby was an older 4.5-in, 30:1 extruder with 200 hp that would have done fine. But the processor preferred the new line because it was easier to operate. Here the hourly operating cost was approximately twice what it could/should have been.

Picking the right size extruder is pretty much a function of the output at a reasonable screw speed. The proper L/D ratio depends on the requirements for mixing, venting, and pressure generation. Horsepower is a function of output and the polymer being processed and can be easily calculated. However, this can be a rather complex matrix of choices, and decisions should be left to experts. 

My advice is to develop an hourly operating cost for each extrusion line and try to fit production to the least expensive line as a part of the scheduling procedure.

NTMA
NTMA
IMTS+
Become a NTMA member today!
MMS Online Apr-2021
Stop Wasting. Start Shredding
Resinworks with Optimizer
TD-Series Desiccant Dryers

Read Next

NPE

Making the Circular Economy a Reality

Driven by brand owner demands and new worldwide legislation, the entire supply chain is working toward the shift to circularity, with some evidence the circular economy has already begun.

Read More
best practices

People 4.0 – How to Get Buy-In from Your Staff for Industry 4.0 Systems

Implementing a production monitoring system as the foundation of a ‘smart factory’ is about integrating people with new technology as much as it is about integrating machines and computers. Here are tips from a company that has gone through the process.

Read More
NTMA